Project Details
Chevron Long Wharf Causeway/Trestle Seismic Upgrade
Project started in 1998
Project completed in 2000
Project Type: Marine
Owner: Chevron Products Co.
Location: Richmond, CA
Contract Amount: $6.2 Million
Designer: Moffatt & Nichol
For this project 244 steel pipe piles were driven through 122 holes cut in the existing causeway deck. The falsework and side forms were installed below the causeway for new concrete bent caps at each cluster of four piles. Six existing causeway expansion joints were demolished and rebuilt to allow for greater movement during a seismic event. A new pipe trestle was made of steel beams and 609 pony bents and pipe supports.
__________________________________________________________