Structures that last are built on strong foundations. For General Construction, that's not just an engineering principle, it's our business philosophy.

Project Details

Bainbridge Island Ferry Terminal

Project started in 2005
Project completed in 2006
Project Type: Marine
Owner: Washington State Ferries
Location: Bainbridge Island, WA
Contract Amount: $6.6 Million
Designer: BERGER/ABAM
 

This project consisted of demolishing the existing transfer span, apron, headframe, towers, tower foundations, trestle walkway and bridge seat for Slip 2. A new trestle consisting of precast prestressed deck units, precast pile caps and bridge seat was installed as well as hydraulic actuated transfer span, apron and lift cylinder shafts. Steel piles, a concrete trestle and a hoisting mechanism were also fabricated and installed.

 