Structures that last are built on strong foundations. For General Construction, that's not just an engineering principle, it's our business philosophy.

Project Details

Production Line Hydraulic System

Project started mid 2006
Project completed July 2007
Project Type: Industrial
Owner: Manufacturing Company
Location: Everett, WA
Contract Amount: $2 Million
Designer: Wood-Harbinger, Inc.
 

General Construction furnished and installed this system, which supplies hydraulics to airplanes during assembly. The primary components include a 1,500 gallon stainless steel storage tank and 6,600 feet of stainless steel pipe. The piping installation required more than 850 welded connections, many in difficult, awkward, and tight positions. Quality control included 100% x-ray weld inspection of all joints on the high pressure supply side as well as 8,500 psi pressure testing of the entire system. General also self-performed all the electrical and controls work on this project.

 

__________________________________________________________
This page was generated on 5/18/2013.
< Show most current projects
< Back
< Go to the Search
 

< Print