Structures that last are built on strong foundations. For General Construction, that's not just an engineering principle, it's our business philosophy.

Project Details

Bangor Fox Island Lab Relocation

Project started in June 2007
Project completed in January 2008
Project Type: Marine
Owner: US Navy
Location: Bangor, WA
Contract Amount: $1.5 Million
Designer: Winzler & Kelly
 

General Construction Company was a subcontractor to Watts Constructors for the construction of an acoustics testing facility located at Bangor Subase on the Kitsap Peninsula in Washington. The facility was built on a floating pontoon the Navy purchased. Generals scope of work consisted of constructing the approach trestle, eight mooring dolphins for the pontoon, and mooring the pontoon with assistance from the Navy. A total of 20 trestle piles and 40 dolphin piles were driven, 4 precast and 2 cast in place trestle pile caps were installed, 25 channel beams for trestle deck were installed, 8 dolphin pile tops were formed and poured, and a mooring pontoon was constructed.

 

__________________________________________________________
This page was generated on 9/7/2010.
< Show most current projects
< Back
< Go to the Search
 

< Print