Structures that last are built on strong foundations. For General Construction, that's not just an engineering principle, it's our business philosophy.

Project Details

Compressed Air Upgrades

Project started in October 2004
Project completed in December 2004
Project Type: Industrial
Owner: Heavy Manufacturing Client
Location: Renton, WA
Contract Amount: $1 Million
Designer: FSi
 

This project included installing a new 3,000 CFM air compressor with two new mist eliminator prefilters, installing a new refrigerated air dryer, and connecting the compressed air piping, cooling water piping, and circulating pumps. Also included were new electrical switchgear installation and power and control wiring.

 