Project Details
Compressed Air Upgrades
Project started in October 2004
Project completed in December 2004
Project Type: Industrial
Owner: Heavy Manufacturing Client
Location: Renton, WA
Contract Amount: $1 Million
Designer: FSi
This project included installing a new 3,000 CFM air compressor with two new mist eliminator prefilters, installing a new refrigerated air dryer, and connecting the compressed air piping, cooling water piping, and circulating pumps. Also included were new electrical switchgear installation and power and control wiring.