Structures that last are built on strong foundations. For General Construction, that's not just an engineering principle, it's our business philosophy.

News Article

Northwest Construction Best of 2007

December, 2007

New fish bypass spillway through a future turbine unit of the Wanapum Dam. The bypass has a 290 foot chute with an opening width of 18.5 feet and an exit width of 90 feet.

http://northwest.construction.com/projects/07_Bestof/12_2007_BestOf.pdf

__________________________________________________________
This page was generated on 9/10/2010.
< Back
< Go to the Search