Hamilton Avenue Bascule Bridge Project
Project started in August, 2005
This project includes the rehabilitation of the Hamilton Avenue Bascule Bridge over the Gowns Canal in Brooklyn, NY. |
 |
 |
Heating System Upgrade
Currently in construction
General Construction replaced the majority of the mechanical fittings on the existing heating system's carbon steel pipes with welded fittings. |
 |
 |
Hood Canal Bridge Retrofit & East Half Replacement
Project started in July, 2003
General Construction is replacing the east half of the Hood Canal Bridge and renovating the newer west half of the bridge. |
 |
 |
Revelstoke Penstock Project
Project began November 2007
As a joint venture with Kiewit's Western Canada District, General Construction Company is installing the fifth penstock at Revelstoke Dam in Canada. |
 |
 |
San Francisco - Oakland Bay Bridge E2/T1 Foundation
Currently in construction
As part of a KFM joint venture, General Construction built two foundations for the main span of the future self anchored suspension span of the San Francisco Oakland Bay Bridge. |
 |
 |
Skylight Installation Project
Project began in October of 2007
This project includes the installation of giant 25 ft x 27 ft skylights in a huge manufacturing facility in Everett. |
 |
 |
Terminal 30 Upgrade, Port of Seattle
Project started October 2007
The 43-acre Terminal 30 Upgrade project includes relocation of the Cruise Ship operation, and returning the terminal to its original function as a container terminal. |
 |
 |
Terminal 91 Berth M Reconstruction, Port of Seattle
Project began October 2007
This project includes the demolition of the old timber apron and supporting piles and construction of a new dock supported with concrete and sheet piles. |
 |