Priest Rapids Dam Fish Bypass
Project started in September 2005 - Project completed in March 2006
General Construction modified two existing spillways for fish bypass. |
 |
 |
Orleans Outfall Canal Interim Closure Structure
Project started in February 2006 - Project completed in December 2006
General Construction was a participating Kiewit district that aided in the construction of an interim gated flood control structure on the canal at Lake Pontchartrain. |
 |
 |
Hamilton Avenue Bascule Bridge Project
Project started in August 2005 - Project completed in 2009
This project included the rehabilitation of the Hamilton Avenue Bascule Bridge over the Gowns Canal in Brooklyn, NY. |
 |
 |
San Francisco - Oakland Bay Bridge, Skyway Segment
Project started in 2002 - Project completion 2008
The $1.2 billion Skyway Segment of the San Francisco-Oakland Bay Bridge project included the construction of a mile and a half of side-by-side viaduct bridge structures in San Francisco Bay. |
 |
 |
Benicia Segmental Bridge
Project started in 2001 - Project was completed August 2007
Construction of a five lane segmental concrete bridge spanning the Carquinez Strait. |
 |
 |
Allen Street Bridge Replacement
Project started in 1999 - Project completed in 2001
Replacement of two lane, multi-span steel truss bridge originally built in 1923. |
 |
 |
Bonneville Dam Juvenile Fish Bypass System Outfalls
Project started in 1998 - Project completed in 1999
Two juvenile fish bypass outfalls in the Columbia River downstream of Bonneville Dam were installed. |
 |
 |
John Day Dam Flow Deflectors
Project started in 1996 - Project completed in 1998
General Construction contract was to build 17 pier extensions and 18 flow deflectors 30 ft underwater along the spillway face of the dam. |
 |
 |
Ice Harbor Navigation Coffer Cells
Project started in 1996 - Project completed in 1997
Spillway deflectors were installed at eight of the Ice Harbor Dam's ten spillways. |
 |
 |
San Francisco - Oakland Bay Bridge E2/T1 Foundation
Project started April 2004 - Completed March 2008
As part of a KFM joint venture, General Construction built two foundations for the main span of the future self anchored suspension span of the San Francisco Oakland Bay Bridge. |
 |
 |
Wanapum Dam Fish Bypass
June 2005 - Completed April 2008
General Construction constructed a new fish bypass spillway at Wanapum Dam, located on the Columbia River near Vantage, WA. |
 |
 |
Tacoma Narrows Bridge
Began July 2004 - Finished March 2008
General Construction Company was part of the team who constructed a 5,200 ft suspension bridge adjacent to the existing bridge in Tacoma, WA. |
 |