Automobile Shredder
Project started in September, 1999 - Project completed in February, 2000
Installation of a state of the art automobile shredder for recycling automobiles into scrap steel. |
 |
 |
Compressed Air Upgrades
Project started in October, 2004 - Project completed in December, 2004
This project included installation of a new 3,000 CFM air compressor. |
 |
 |
Continuous Homogenizing Furnace
Project started in June, 1998 - Project completed in December, 1998
The objective of this project was to replace an existing aluminum billet homogenizing system with a state-of-the-art fully automatic continuous homogenizing system. |
 |
 |
Crane Upgrade
Project started in 1999 - Project completed in 2003
This program upgraded the overhead bridge cranes in five assembly buildings at customer's Renton plant. |
 |
 |
Everett Factory Realignment
Project started in 2006 - Project completed in 2007
Conversion of 170,000 sq ft of manufacturing space into office facilities. |
 |
 |
Factory Seismic Upgrade
Project started in 1997 - Project completed 9/2002
General Construction structurally reinforced client's assembly facility in Everett. |
 |
 |
Heating System Upgrade
Currently in construction - Scheduled to finish in 2009
General Construction replaced the majority of the mechanical fittings on the existing heating system's carbon steel pipes with welded fittings. |
 |
 |
Production Line Hydraulic System
Project started mid 2006 - Project completed July 2007
General Construction furnished and installed this system, which supplies hydraulics to the assembly line. |
 |
 |
Skylight Installation Project
Project began in October of 2007 - Projected completion May 2009
This project includes the installation of giant 25 ft x 27 ft skylights in a huge manufacturing facility in Everett. |
 |
 |
Stacker Crane Replacement
Project started in April 2007 - Project finished September 2007
This project included the installation of approximately 3,500 lin ft of crane rail. |
 |