Automobile Shredder

Project started in September, 1999 - Project completed in February, 2000
Installation of a state of the art automobile shredder for recycling automobiles into scrap steel.

Compressed Air Upgrades

Project started in October, 2004 - Project completed in December, 2004
This project included installation of a new 3,000 CFM air compressor.

Continuous Homogenizing Furnace

Project started in June, 1998 - Project completed in December, 1998
The objective of this project was to replace an existing aluminum billet homogenizing system with a state-of-the-art fully automatic continuous homogenizing system.

Crane Upgrade

Project started in 1999 - Project completed in 2003
This program upgraded the overhead bridge cranes in five assembly buildings at customer's Renton plant.

Everett Factory Realignment

Project started in 2006 - Project completed in 2007
Conversion of 170,000 sq ft of manufacturing space into office facilities.

Factory Seismic Upgrade

Project started in 1997 - Project completed 9/2002
General Construction structurally reinforced client's assembly facility in Everett.

Heating System Upgrade

Currently in construction - Scheduled to finish in 2009
General Construction replaced the majority of the mechanical fittings on the existing heating system's carbon steel pipes with welded fittings.

Production Line Hydraulic System

Project started mid 2006 - Project completed July 2007
General Construction furnished and installed this system, which supplies hydraulics to the assembly line.

Skylight Installation Project

Project began in October of 2007 - Projected completion May 2009
This project includes the installation of giant 25 ft x 27 ft skylights in a huge manufacturing facility in Everett.

Stacker Crane Replacement

Project started in April 2007 - Project finished September 2007
This project included the installation of approximately 3,500 lin ft of crane rail.

 