Listed below are marine projects that are
completed or currently under construction. To view details
for each project, please click the project name.
 |
Production Line Hydraulic System
Project started mid 2006 - Project completed July 2007
General Construction furnished and installed this system, which supplies hydraulics to the assembly line. |
 |
 |
Napkin Packaging Line Installation
Project started in September, 2004 - Project completed in February, 2005
General Construction installed a converting and packaging production line at a paper manufacturing mill. |
 |
 |
Automobile Shredder
Project started in September, 1999 - Project completed in February, 2000
Installation of a state of the art automobile shredder for recycling automobiles into scrap steel. |
 |
 |
Relocate and Upgrade Tissue Packaging Line
Project started in October, 2005 - Project completed in February, 2006
For this project General Construction moved and upgraded a production line which converts very large rolls of tissue to finished product. |
 |
 |
Compressed Air Upgrades
Project started in October, 2004 - Project completed in December, 2004
This project included installation of a new 3,000 CFM air compressor. |
 |
 |
Tissue Machine Rebuild
Project started in November, 2005 - Project completed in January, 2006
General Construction replaced and relocated paper rolls, the drying air system, two 9 MM BTU burners and a Smartfire control system. |
 |
 |
Continuous Homogenizing Furnace
Project started in June, 1998 - Project completed in December, 1998
The objective of this project was to replace an existing aluminum billet homogenizing system with a state-of-the-art fully automatic continuous homogenizing system. |
 |
 |
Paper Machine Fan Pump Drive
Project started in January, 2005 - Project completed in August, 2005
General Construction replaced three fan pump drives for 600 Hp motors at paper manufacturing facility in Washington. |
 |
 |
Substation Replacement & Power System Upgrades
Project started in January, 2004 - Project completed in July, 2004
General Construction was responsible for building a new substation at paper manufacturing facility. |
 |
 |
Stacker Crane Replacement
Project started in April 2007 - Project finished September 2007
This project included the installation of approximately 3,500 lin ft of crane rail. |
 |
 |
Switchgear Relocation
Project started in 2006 - Project completed in 2007
This project included the relocation of a new primary 15kV distribution system and switchgear. |
 |
 |
Everett Factory Realignment
Project started in 2006 - Project completed in 2007
Conversion of 170,000 sq ft of manufacturing space into office facilities. |
 |
 |
Crane Upgrade
Project started in 1999 - Project completed in 2003
This program upgraded the overhead bridge cranes in five assembly buildings at customer's Renton plant. |
 |
 |
Factory Seismic Upgrade
Project started in 1997 - Project completed 9/2002
General Construction structurally reinforced client's assembly facility in Everett. |
 |
 |
Scott Worldwide Cogeneration Project
Project started in 1993 - Project completed in 1995
For this project General Construction built a state-of-the-art cogeneration facility primarily for burning spent sulfite liquid from the pulping process and sawdust from area sawmills. |
 |
 |
Skylight Installation Project
Project began in October of 2007 - Projected completion May 2009
This project includes the installation of giant 25 ft x 27 ft skylights in a huge manufacturing facility in Everett. |
 |
 |
Heating System Upgrade
Currently in construction - Scheduled to finish in 2009
General Construction replaced the majority of the mechanical fittings on the existing heating system's carbon steel pipes with welded fittings. |
 |
 |
Tissue Paper Machine 3 Rebuild
- Project completed in 1997
This project included the installation of a new head box, Yankee dryer hood with burners and gas train, drives, vacuum system, pumps, piping, pressure screen, showers and control system. |
 |