Listed below are marine projects that are
completed or currently under construction. To view details
for each project, please click the project name.
 |
Homer M. Hadley Bridge Repair
Project will start May 2009 - Project completion anticipated July 2009
General Construction Company replaced four expansion joints on the Homer M. Hadley Bridge, I-90. |
 |
 |
Pier 23 Replacement Project
Project starts July 2009 - Project will finish May 2011
This contract is for the removal and replacement of 600 feet of pier in Tacoma, WA. |
 |
 |
Post Point Alternative Outfall
Project started September 2007 - Project completed September 2007
General worked as a subcontractor to Strider Construction for this outfall project in Bellingham, WA. |
 |
 |
Terminal 30 Upgrade, Port of Seattle
Project started October 2007 - Projected completion date June 2009
The 43-acre Terminal 30 Upgrade project included relocation of the Cruise Ship operation, and returning the terminal to its original function as a container terminal. |
 |
 |
Day Island Marina
Project started July 2008 - Project completed September 2008
General Construction Company maintenance-dredged the Day Island Harbor Marina in University Place, WA. |
 |
 |
South Bay Ocean Outfall
Project started January of 1996 - Project completed January 1998
The South Bay Ocean Outfall is the final segment of a wastewater treatment facility designed to collect and treat sewage from Tijuana, Mexico. |
 |
 |
Electric Boat Graving Docks 1 & 2
Project started in September, 2006 - Project finished April 2008
This project consisted of long term repair of Graving Docks #1 & 2, in which building reinforced and thru-tied concrete walls on the basin and docks occurred. |
 |
 |
Bangor Fox Island Lab Relocation
Project started in June 2007 - Project completed in January 2008
This project included the construction of a concrete trestle supported by twenty steel piles. |
 |
 |
Kingston Outfall
Project started in June 2004 - Project completed in October 2007
This project required the installation of one mile of 18 in. steel outfall pipe adjacent to the ferry landing in Kingston, WA. |
 |
 |
Midway Sewer District Submarine Outfall
Project started in June 2007 - Project completed in January 2008
This project included the installation of 2,100 ft of 48 in. steel outfall pipe to the diffuser section which runs to a depth of -170 MMLW. |
 |
 |
Yaquina North Jetty Rock Removal
Project started in July 1999 - Project completed in September 1999
General Construction rebuilt the Yaquina North Jetty in Oregon. |
 |
 |
Marine Docking Facility, U.S. Gypsum
Project started in January, 2000 - Project completed in July 2000
Along the Columbia River in Oregon, General Construction built a concrete wharf and concrete approach trestle. |
 |
 |
Terminal 3 & 4, Port of Tacoma
Project started in January 2005 - Project completed in March 2006
This project included the construction of a 250 lin ft concrete wharf at the Port of Tacoma. |
 |
 |
Norfolk Sediment Remediation
Project started in January 1999 - Project completed in April 1999
This project was part of the Elliot Bay/Duwamish dredging and restoration. |
 |
 |
Bainbridge Island Ferry Terminal
Project started in 2005 - Project completed in 2006
General Construction demolished the existing ferry terminal slip and constructed new slip. |
 |
 |
Bangor Building 7111 Addition & Service Pier Upgrade
Project started in 2004 - Project completed in 2005
General Construction was responsible for upgrading existing service pier and facility to accommodate a new submarine homeport. |
 |
 |
Todd Shipyard Sediment Remediation Project
Project started in 2004 - Project completed in 2005
General Construction dredged 203,000 cu yd of contaminated sediment that was then trans-loaded into railcars for upland disposal. |
 |
 |
Pierce County Terminal Expansion
Project started in 2002 - Project completed in 2003
This project consisted of dredging and habitat construction at the Pierce County Slip 5 Terminal in Tacoma, WA. |
 |
 |
Lake Youngs Intake
Project started in 2002 - Project completed in 2003
This intake pier, for an active drinking water reservoir, required 500-tons of fabricated steel, piles and four piers supporting a pump platform. |
 |
 |
Bainbridge Island Ferry Terminal Dolphin Replacement Phase II
Project started in 2001 - Project completed in 2002
General Construction replaced of Bainbridge Island ferry terminal dolphins. |
 |
 |
Kingston Ferry Terminal Phase II Dolphin Replacements
Project started in 2001 - Project completed in 2002
General Construction replaced the dolphins at Kingston ferry terminal. |
 |
 |
Anacortes Ferry Terminal Slip 2 Refurbishment, Slips 1 & 2 Dolphins
Project started in 2001 - Project completed in 2002
Refurbishment of Anacortes ferry terminal slips. |
 |
 |
Keyport Pier Replacement
Project started in 2000 - Project completed in 2002
This design build project consists of a modern pier and new floating structures to accommodate research vessels at the Keyport Undersea Warfare Research Station. |
 |
 |
Pier D Replacement
Project started in 2000 - Project completed in 2003
This design build project consisting of building a 1350 x 150 carrier berthing pier at the Naval Station in Bremerton. |
 |
 |
Navigation and Sediment Dredging, Puget Sound Naval Shipyard
Project started in 2000 - Project completed in 2001
This project was a large scale environmental dredging at Bremerton's Naval Shipyard in Washington. |
 |
 |
Neah Bay Coast Guard Pier
Project started in 1999 - Project completed in 2000
This project required the demolition of an existing 650 ft timber pier and construction of a new concrete pier and concrete mooring floats. |
 |
 |
Terminal 55/56, Port of Oakland
Project started in 1999 - Project completed in 2001
This project included the demolishing of existing concrete piers, hydraulic dredging and construction of a new wharf. |
 |
 |
Chevron Long Wharf Causeway/Trestle Seismic Upgrade
Project started in 1998 - Project completed in 2000
This project included seismically strengthening the 3,800 ft, two lane concrete causeway as well as replacing a timber pipe trestle that paralleled the existing concrete causeway with a new steel trestle. |
 |
 |
Shilshole Marina
Project started in 1996 - Project completed in 1998
At Shilshole Marina, General Construction demolished an old pier and construction a new 600 lin ft pier. |
 |
 |
Alameda Channel Maintenance Dredging
Project started August 2008 - Project completion was November 2008
General Construction Company was contracted for the Alameda maintenance channel dredging in California. |
 |
 |
Lopez Island Ferry Terminal
Project started August 2006 - Completed December 2007
This project provided for the preservation of the Lopez Ferry Terminal in San Juan County, Washington. |
 |
 |
Terminal 91 Berth M Reconstruction, Port of Seattle
Project began October 2007 - Completed June 2008
This project included the demolition of the old timber apron and supporting piles and construction of a new dock supported with concrete and sheet piles. |
 |
 |
Terminal 115, Port of Seattle
Project began October 2006 - Project completed April 2008
General Construction reconstructed and upgraded one of the largest break bulk barge facility in the Western Hemisphere. |
 |
 |
Replace Fendering System at Pier 7
June 2008 - Anticipated completion November 2008
General Construction removed and replaced the fender system at Pier 7 in Bremerton. |
 |
 |
Electric Boat Graving Dock 3
January 2005 - February 2006
This project included construction of tied-back concrete retaining walls in front of the existing sheetpile wall. |
 |
 |
Port of Anchorage Maintenance Dredging
- Project completed in November 2002
General Construction did massive maintenance dredging at the Port of Anchorage in Alaska. |
 |