Bangor Building 7111 Addition & Service Pier Upgrade
Project started in 2004 - Project completed in 2005
General Construction was responsible for upgrading existing service pier and facility to accommodate a new submarine homeport. |
 |
 |
Bangor Fox Island Lab Relocation
Project started in June 2007 - Project completed in January 2008
This project included the construction of a concrete trestle supported by twenty steel piles. |
 |
 |
Chevron Long Wharf Causeway/Trestle Seismic Upgrade
Project started in 1998 - Project completed in 2000
This project included seismically strengthening the 3,800 ft, two lane concrete causeway as well as replacing a timber pipe trestle that paralleled the existing concrete causeway with a new steel trestle. |
 |
 |
Keyport Pier Replacement
Project started in 2000 - Project completed in 2002
This design build project consists of a modern pier and new floating structures to accommodate research vessels at the Keyport Undersea Warfare Research Station. |
 |
 |
Marine Docking Facility, U.S. Gypsum
Project started in January, 2000 - Project completed in July, 2000
Along the Columbia River in Oregon, General Construction built a concrete wharf and concrete approach trestle. |
 |
 |
Neah Bay Pier Coast Guard Pier
Project started in 1999 - Project completed in 2000
This project required the demolition of an existing 650 ft timber pier and construction of a new concrete pier and concrete mooring floats. |
 |
 |
Pier D Replacement
Project started in 2000 - Project completed in 2003
This design build project consisting of building a 1350 x 150 carrier berthing pier at the Naval Station in Bremerton. |
 |
 |
Terminal 115, Port of Seattle
Project began October 2006 - Project completed April 2008
General Construction reconstructed and upgraded one of the largest break bulk barge facility in the Western Hemisphere. |
 |
 |
Terminal 3 & 4, Port of Tacoma
Project started in January, 2005 - Project completed in March, 2006
This project included the construction of a 250 lin ft concrete wharf at the Port of Tacoma. |
 |
 |
Terminal 30 Upgrade, Port of Seattle
Project started October 2007 - Projected completion date June 2009
The 43-acre Terminal 30 Upgrade project includes relocation of the Cruise Ship operation, and returning the terminal to its original function as a container terminal. |
 |
 |
Terminal 55/56, Port of Oakland
Project started in 1999 - Project completed in 2001
This project included the demolishing of existing concrete piers, hydraulic dredging and construction of a new wharf. |
 |
 |
Terminal 91 Berth M Reconstruction, Port of Seattle
Project began October 2007 - Expected completion date is May 2008
This project includes the demolition of the old timber apron and supporting piles and construction of a new dock supported with concrete and sheet piles. |
 |